top of page

Case Studies

Fume Cupboards

Boultings Group - AstraZeneca CPL4 Building

Overview

Mach-Aire has designed, built and installed 5 bespoke fume cupboards and 4 weigh cabinets at AstraZeneca’s Macclesfield site (CPL4 building).

The Problem

AstraZeneca were looking to extend their existing laboratory to increase the production of chemicals, at their Macclesfield site

The Solution

The principal contractor, Boultings Group, commissioned Mach-Aire to design, build and install 5 fume cupboards; including 2 x 1800mm bench mounted fume cupboards, 1 x 1500mm bench mounted fume cupboards and 2 x 150mm step in fume cupboards. Mach-Aire worked closely with the client to design a bespoke solution for the development of a slide out chassis mounted HMI, which were fitted to the fume cupboards. In addition to the fume cupboards, Mach-Aire also designed and installed 4 re-circulation weigh stations.

After Care

The high quality solution and level of service provided throughout phase one of the project has seen Mach-Aire asked to re-commission all fume cupboards in the existing CPL3 building.

Image courtesy of Boultings Group

MA Triangle - White and Red.png

KET FACTS

  • Designed, built and installed 5 bespoke fume cupboards and 4 re-circulation weigh stations in the newly extended CPL4 building.

  • Designed bespoke solution for the process control HMI for the fume cupboards.

  • Contracted to re-commission all fume cupboards in the existing laboratory.

  • Dedicated project engineer was assigned to work with the client and contractors.

  • Regular design meetings held to ensure the fume cupboard designs met the client specifications.

FIND OUT MORE

The high quality solution and level of service provided throughout phase 1 of the project has seen Mach-Aire asked to re-commission all fume cupboards in the existing laboratory.

Boultings Group